The techniques of surface potential methods for corrosion surveys on pipe lines will be reviewed. Instruments for the survey must be suitable, for use by field personnel. The economics of conducting complete corrosion surveys on bare pipe lines, are discussed. The economic aspects for determining location of galvanic anode installations versus regularly spaced installations will also be presented.

This content is only available as a PDF.
You do not currently have access to this content.