The construction industry is one of the major producers of municipal solid waste. Although there are many studies in municipal solid waste management, the research on the recovery of recyclable building material from construction sites remains limited. This paper addresses the optimal design issue of the construction and demolition (C&D) waste logistics network based on the features of the construction industry from the contractors’ perspective. The purpose of this paper is to provide an optimal C&D waste recycling network decision (RND) model considering the change of construction sites location over time. A multi-period and multi-objective mixed-integer linear programming model was developed to minimize the cost of C&D waste disposal for contractors, and to minimize the carbon emissions from C&D waste transportation. An application study was conducted to assess the performance of the RND model. Through some sensitivity analysis experiments based on an immune genetic algorithm, the influences of environmental policies and carbon tax policy on improving the recycling rate of C&D waste and reduce the carbon emission were explored. The findings of this research suggest that: (1) a RND model with the feature of the construction industry developed in this paper can effectively optimize the C&D waste logistics network; (2) government policies and laws are valid political instruments to improve the recycling rate of C&D waste; (3) the carbon-tax analyses demonstrate that a carbon tax policy can effectively reduce carbon emissions.

Abou Najm,
M.,
El-Fadel
M.,
Ayoub
G.,
El-Taha
M.,
and
Al-Awar
F.
.
2002
.
“An optimisation model for regional integrated solid waste management I. Model formulation,”
Waste Management & Research
,
20
:
37
45
.
Achillas
Ch,,
Vlachokostas
Ch,
Aidonis
D.,
Moussiopoulos
N.,
Iakovou
E.,
and
Banias
G.
.
2010
.
“Optimising reverse logistics network to support policy-making in the case of Electrical and Electronic Equipment,”
Waste Management
,
30
:
2592
600
.
Ajayi,
Saheed O.,
Lukumon
O. Oyedele,
Muhammad Bilal,
Olugbenga O. Akinade,
Hafiz
A. Alaka,
Hakeem
A. Owolabi,
and
Kabir
O. Kadiri
.
2015
.
“Waste effectiveness of the construction industry: Understanding the impediments and requisites for improvements,”
Resources, Conservation and Recycling
,
102
:
101
12
.
Baroni,
G.,
and
Tarantola
S.
.
2014
.
“A General Probabilistic Framework for uncertainty and global sensitivity analysis of deterministic models: A hydrological case study,”
Environmental Modelling & Software
,
51
:
26
34
.
Barros,
A. I.,
Dekker
R.,
and
Scholten
V.
.
1998
.
“A two-level network for recycling sand: A case study,”
European Journal of Operational Research
,
110
:
199
214
.
Mohd Reza
Esa,,
Halog
Anthony,
and
Rigamonti
Lucia
.
2017
.
“Strategies for minimizing construction and demolition wastes in Malaysia,”
Resources, Conservation and Recycling
,
120
:
219
29
.
Fan
Fei,,
Qu
Lili,
Wen
Zongguo,
Xue
Yanyan,
and
Zhang
Huanan
.
2016
.
“How to integrate the informal recycling system into municipal solid waste management in developing countries: Based on a China’s case in Suzhou urban area,”
Resources, Conservation and Recycling
,
110
:
74
86
.
Hao,
Jane L.,
Hills
Martin J.,
and
Vivian
W. Y. Tam
.
2008
.
“The effectiveness of Hong Kong’s Construction Waste Disposal Charging Scheme,”
Waste Management & Research
,
26
:
553
58
.
Harijani,
Ali Mirdar
Mansour
Saeed,
and
Karimi
Behrooz
.
2017
.
“A multi-objective model for sustainable recycling of municipal solid waste,”
Waste Management & Research
,
35
:
387
99
.
Jeihoonian,
Mohammad,
Zanjani
Masoumeh Kazemi,
and
Gendreau
Michel
.
2016
.
“Stochastic programming approach for closed-loop supply chain network design under uncertain quality status.”
In
6th International Conference on Information Systems, Logistics and Supply Chain, ILS 2016, June 1, 2016—June 4, 2016
.
Bordeaux, France
:
International Conference on Information Systems, Logistics and Supply Chain.
Shuwei
Jia,,
Yan
Guangle,
Shen
Aizhong,
and
Zheng
Jun
.
2017
.
“Dynamic simulation analysis of a construction and demolition waste management model under penalty and subsidy mechanisms,”
Journal of Cleaner Production
,
147
:
531
45
.
Kazemi,
Nima,
Modak
Nikunja Mohan,
and
Govindan
Kannan
.
2018
.
“A review of reverse logistics and closed loop supply chain management studies published in IJPR: a bibliometric and content analysis,”
International Journal of Production Research
,
1
24
.
Kylili,
Angeliki,
and
Fokaides
Paris A.
.
2017
.
“Policy trends for the sustainability assessment of construction materials: A review,”
Sustainable Cities and Society
,
35
:
280
88
.
Min,
H.,
Ko
H. J.,
and
Ko
C. S.
.
2006
.
“A genetic algorithm approach to developing the multi-echelon reverse logistics network for product returns,”
Omega-International Journal of Management Science
,
34
:
56
69
.
Munster,
Marie,
and
Meibom
Peter
.
2011
.
“Optimization of use of waste in the future energy system,”
Energy
,
36
:
1612
22
.
Poon,
C. S.,
Yu
Ann T. W.,
and
Jaillon
L.
.
2004
.
“Reducing building waste at construction sites in Hong Kong,”
Construction Management and Economics
,
22
:
461
70
.
Poon,
C. S.,
Yu
Ann T. W.,
Wong
Agnes,
and
Yip
Robin
.
2013
.
“Quantifying the Impact of Construction Waste Charging Scheme on Construction Waste Management in Hong Kong,”
Journal of Construction Engineering and Management
,
139
:
466
79
.
Schultmann,
F.,
Engels
B.,
and
Rentz
O.
.
2003
.
“Closed-loop supply chains for spent batteries,”
Interfaces
,
33
:
57
71
.
Sinha,
Vinita,
and
Singh
R
.
2009
.
“Immunological role of hardiness on depression,”
31
:
39
44
.
Tam,
Vivian W. Y.,
Li
Jingru,
and
Cai
Hong
.
2014
.
“System dynamic modeling on construction waste management in Shenzhen, China,”
Waste Management & Research
,
32
:
441
53
.
Sie Ting
Tan,,
Tin Lee
Chew,
Hashim
Haslenda,
Ho
Wai Shin,
and
Lim
Jeng Shiun
.
2014
.
“Optimal process network for municipal solid waste management in Iskandar Malaysia,”
Journal of Cleaner Production
,
71
:
48
58
.
Trochu,
Julien,
Chaabane
Amin,
and
Ouhimmou
Mustapha
.
2018
.
“Reverse logistics network redesign under uncertainty for wood waste in the CRD industry,”
Resources Conservation and Recycling
,
128
:
32
47
.
Washington,
I. D.,
and
Swartz
C. L. E.
.
2017
.
“A parallel structure exploiting nonlinear programming algorithm for multiperiod dynamic optimization,”
Computers & Chemical Engineering
,
103
:
151
64
.
Tanja
Wolfsberger,,
Pinkel
Michael,
Polansek
Stephanie,
Sarc
Renato,
Hermann
Robert,
and
Pomberger
Roland
.
2016
.
“Landfill mining: Development of a cost simulation model,”
Waste Management & Research
,
34
:
356
67
.
Jiuping
Xu,,
Shi
Yi,
and
Zhao
Siwei
.
2018
.
“Reverse Logistics Network-Based Multiperiod Optimization for Construction and Demolition Waste Disposal,”
Journal of Construction Engineering and Management
,
145
.
Zhitao
Xu,,
Elomri
Adel,
Pokharel
Shaligram,
Zhang
Qin,
Ming
X. G.,
and
Liu
Wenjie
.
2017
.
“Global reverse supply chain design for solid waste recycling under uncertainties and carbon emission constraint,”
Waste Management
,
64
:
358
70
.
Vinay
Yadav,,
Karmakar
Subhankar,
Dikshit
A. K.,
and
Vanjari
Shivkumar
.
2016
.
“A feasibility study for the locations of waste transfer stations in urban centers: a case study on the city of Nashik, India,”
Journal of Cleaner Production
,
126
:
191
205
.
Yuan,
H. P.,
Shen
L. Y.,
Hao
Jane J. L.,
and
Lu
W. S.
.
2011
.
“A model for cost-benefit analysis of construction and demolition waste management throughout the waste chain,”
Resources, Conservation and Recycling
,
55
:
604
12
.
Hongping
Yuan,,
and
Wang
Jiayuan
.
2014
.
“A system dynamics model for determining the waste disposal charging fee in construction,”
European Journal of Operational Research
,
237
:
988
96
.
Navid
Zarbakhshnia,,
Soleimani
Hamed,
Goh
Mark,
and
Razavi
Seyyedeh Sara
.
2019
.
“A novel multi-objective model for green forward and reverse logistics network design,”
Journal of Cleaner Production
,
208
:
1304
16
.
Zhao,
W.,
Leeftink
R. B.,
and
Rotter
V. S.
.
2010
.
“Evaluation of the economic feasibility for the recycling of construction and demolition waste in China-The case of Chongqing,”
Resources Conservation and Recycling
,
54
:
377
89
.
This content is only available as a PDF.

Author notes

1. School of Management Science and Real Estate, Chongqing University, Chongqing 400045, China.

2. Research Center of Construction Economy and Management, Chongqing 400045,China;

3. School of Mechanical Engineering, Chongqing University, Chongqing 400044,China

4. School of Computing, Engineering and Mathematics, Western Sydney University, Penrith NSW 2751, Australia